Aston Martin V8 (1972–1989) Stainless Steel Bumpers - Complete Kit
Any questions? Contact us!
📞 Tel: +33 7 56 95 43 91
🟢 WhatsApp: +33 7 56 95 43 91
✉️ Email: contact@classic-parechocs.com
📝 Form: Here
We will reply within 24 hours.
Description
New mirror-polished 304 stainless steel bumpers for the Aston Martin V8: a top-quality remanufacture for a highly desirable car.
Successor to the William Towns-designed DBS, the V8 received the 5.3-litre quad-cam engine designed by Polish engineer Tadek Marek and hand-assembled at Newport Pagnell. The Vantage, launched in 1977, was hailed by the British press as the country's first supercar, and the open Volante followed a year later. On screen, Timothy Dalton played James Bond at the wheel of a V8 in The Living Daylights in 1987.
These bumpers can be used to replace the US-specification safety bumpers.
The photos show the European style, without overriders; we can supply overriders to order, at extra cost.
Kit contents
- 1 front bumper
- 1 rear bumper
- Stainless steel fixing hardware
Compatible models
- Aston Martin V8 (1972–1989)
All our parts for this marque: Aston Martin bumpers.
Manufacturing and finish
304 stainless steel blades, mirror polished and formed from the original bumpers. Lifetime guarantee against corrosion.
All our bumpers are trial-fitted, then given an exclusive hand finish in our Dordogne workshop.
The result is unrivalled quality. Before dispatch, each one is dressed with a file so that no cutting marks or sharp edges remain, then smoothed with fine sandpaper.
This finish is unique to our products: it is our signature and our commitment to quality.
Fitting
Fits on the original mounting points, in place of the original bumpers. Can also be fitted in place of the US-specification bumpers.
Shipping and availability
Shipped from our workshop. Prices include VAT; shipping to France and Europe. A question about your model? Call the workshop on +33 7 56 95 43 91.
Shipping costs: France €50 · European Union €100 · United Kingdom £110. Other destinations: please get in touch. Lead times depend on production, and the workshop will confirm yours when you order (shipping policy).